Esta página está traducida automáticamente. Prevalece la versión en inglés. English
Multinacionales Multinacionales · Finanzas

Intercompany and consolidation in Dynamics 365.

A consolidation is only as fast as the weakest intercompany balance. The goal is a close in which eliminations are a process, not a project.

← Multinationals

What speeds consolidation up

A close accelerates when the inputs agree before they are consolidated: exchange differences visible during the month, intercompany posted once and mirrored, local charts mapped in design, and eliminations that run as a process with an owner.

Intercompany balances that agree as they post
One period calendar and cut-off across entities
Local charts mapped to the group chart in Design
Automated eliminations with an audit trail

What the design fixes

One group chart with local statutory mappings, so translation is a rule rather than a rebuild. Intercompany transactions posted once and mirrored, with automated eliminations. A rate policy stated once (source, timing, revaluation). Consolidated reporting drilled back to the source document.

Reporting standards

Groups report under IFRS, or a local equivalent such as the Australian AASB standards. IFRS 18 and AASB 18 change the structure of the income statement for annual periods beginning on or after 1 January 2027, which is worth designing into the chart now rather than rebuilding later.

What you receive from a discovery workshop

A short, written output you can take to your board or another implementer.

A fit-gap of your processes against standard Dynamics 365
A recommended platform and entity structure, with the reasoning
A group design outline: chart, dimensions, approval matrix and integration map
A phased plan, with the pilot country and wave grouping proposed
A scoped estimate and the cost drivers behind it

How an engagement runs

It starts with a 45-minute consultation, then a discovery and fit-gap workshop on your own processes. You receive a written fit-gap and a phased plan before a programme is agreed. Four phases follow, each with something you can use and review.

01

Descubre

Talleres de procesos, auditoría de datos y un ajuste con el producto estándar.

02

Diseño

Plano de la solución, mapa de integración y las extensiones que realmente necesitaremos.

03

Despliegue

Configuración, ensayo de migración, formación basada en roles, UAT y transición por fases.

04

Apoyo

Hypercare, servicios gestionados, portal de clientes, revisiones de optimización programada.

What drives the cost: users, legal entities and currencies, integrations, data migration and the gaps found against standard. See how pricing works or run the three-minute readiness score.

Preguntas frecuentes

Can you run IFRS and local GAAP side by side?

Yes, through parallel ledgers or a mapped chart, depending on the requirement. We decide it in the Design phase.

Can the group close be faster?

Usually. The gains come from posting intercompany once, mirroring it, and eliminating automatically.

General information, not tax, legal or accounting advice. Mandates, rates, thresholds and dates differ by country and change; confirm the current position with the relevant authority and your advisers before relying on it.

Last reviewed 2026-10-11

Hablemos de Soluciones.

Planifica tu hoja de ruta ERP CRM con nuestros expertos.

Reserva una consulta Estima tu retorno
Llamada Reserva una consulta
Software Dynamics
Normalmente responde dentro del horario laboral (EAT)
Hola. ¿Qué intentas resolver? Elige uno y te dirigiremos a la persona adecuada. Quiero ver una demo Soy un cliente existente y necesito apoyo Háblame de la facturación electrónica